Fabrication-ready models and drawings your shop can cut, drill and weld from. First time.
INTRO
Steel goes wrong on paper long before it goes wrong on site. A missing bolt hole. A beam that clashes with a duct. A connection nobody checked.
Our detailers build every member, plate, bolt and weld in a 3D model, check it against the design and the other trades, then pull out the drawings and machine files your fabricator needs. Less rework in the shop. Fewer surprises at erection.
What we deliver
- 3D steel model — every member, plate, bolt and weld modelled to fabrication level (LOD 400), shared as IFC for coordination
- Anchor bolt & embed plans — setting-out for the foundation crew before the steel arrives
- GA & erection drawings — plans, elevations and sections with piece marks and erection sequence
- Assembly & single-part drawings — fully dimensioned, with weld symbols, hole details and material grades
- Machine files & reports — NC/DSTV and DXF files, bills of material, bolt lists and advance bills for early ordering
- Connection detailing — connections modelled to the engineer’s design intent, with queries raised before they become site problems
What we cover
- Primary structural steel: frames, trusses, portals, braced bays
- Miscellaneous metals: stairs, handrails, ladders, platforms, canopies
- Pre-engineered and industrial buildings
- Pipe racks and equipment support
- Mezzanines and plant platforms
- Secondary steel for façades, louvres and MEP supports
How we work
- Review — we study the IFC drawings and specs and raise RFIs early, not mid-model
- Model — 3D model built to your numbering and shop standards
- Check — independent checker review plus clash detection against architecture and MEP
- Approve — drawings issued for approval; advance bills released so you can order material
- Release — approved drawings and machine files released for fabrication
- Support — revisions tracked and turned around fast as the design changes
Why TXG for Steel Detailing
- We think in models, not just drawings — over a decade of BIM delivery means your steel model is coordination-ready from day one.
- Steel, façade and MEP under one roof — support steel, cladding brackets and service penetrations get resolved together, not on site.
- Teams across time zones — delivery from India with project teams in KSA, so work keeps moving while your shop sleeps.
