Facility management that works from day one, with every asset already in the system.
INTRO
Handover is where good data usually dies. Asset lists end up in spreadsheets, O&M manuals in boxes, and the FM team starts from scratch.
We set up your CAFM system from the BIM model and project data. Assets, locations, warranties and maintenance plans are loaded and linked before the keys change hands. We build LOD 500 asset information models and extract the asset register and COBie data, so nothing is lost at handover.
What we deliver
- Asset register — every maintainable asset captured with location, attributes and documents
- COBie extraction — structured handover data pulled straight from the model
- CAFM configuration — system set up around your sites, buildings, floors and spaces
- Data migration — legacy spreadsheets and records cleaned and loaded
- Planned maintenance set-up — PPM schedules linked to every asset
- Space management — room data, areas and occupancy, ready to use
- Asset information layouts — FM drawings and layouts extracted from the model
- Training — your FM team trained to run it
What we cover
- New buildings at handover
- Existing buildings and portfolios
- Campuses, districts and giga-projects
- Sports, leisure and public venues
How we work
- Define — FM needs, asset classification and data requirements agreed
- Capture — data gathered from models, O&M manuals and site surveys
- Validate — data checked, gaps found and filled
- Configure — CAFM set up and data loaded
- Train — FM teams trained on daily workflows
- Support — help through go-live and beyond
Why TXG for CAFM Implementation
- BIM experts first — we know where the asset data lives in the model, and how to get it out clean.
- Proven at handover — LOD 500 asset models, asset registers and COBie delivered on large public venues.
- Ready for Digital Twin — your CAFM data becomes the base for a live twin when you’re ready.
