Quantities pulled from the model measured the way your contract needs them, and traceable to every element.
INTRO
Cost certainly starts with quantities you can defend. Manual take-offs from 2D drawings are slow, and one missed layer can sink a tender.
We extract quantities straight from BIM models or build the model first when there isn’t one. Then we structure them to the agreed method of measurement and hand over a BOQ that ties back to the design, line by line.
What we deliver
- Model-based quantity take-off — quantities extracted directly from Revit, Tekla and IFC models
- BOQ preparation — to NRM2, POMI, CESMM4, SMM7 or your own format
- 2D take-off — when there’s no model, from PDF and DWG drawings
- Material take-offs — steel tonnage, rebar, concrete, MEP and façade quantities for procurement
- 5D BIM — cost data linked to model elements, so quantities update as the design changes
- Change quantification — what moved between revisions, measured and reported
- Measurement mark-ups — color-coded drawings and model views showing exactly what was measured
What we cover
- Civil and structural works
- Architecture and finishes
- MEP services
- Façade and envelope
- Infrastructure and external works
How we work
- Audit the model — we check it’s fit for quantities first: missing elements, wrong categories, duplicates
- Map — elements mapped to the measurement standard and classification
- Extract — quantities pulled from the model, with 2D take-off filling any gaps
- Validate — cross-checked against drawings and spot-measured
- Format — BOQ issued in your template, with mark-ups for traceability
- Update — re-measured as revisions come through, with changes flagged
Why TXG for BOQ & Quantification
- We know when a model lies — we’re BIM specialists first, so we catch the modelling errors that quietly distort a BOQ.
- Traceable to the element — every line in the BOQ links back to something you can see in the model.
- Fast re-measure — design changes are re-quantified in days, not weeks.
